Excavation Plans

Front Elevation

  • Excavator (Bobcat) entered the area through existing garage and turned right

  • This was possible since the House was built on steel beams and not stumps

  • Over 200 m² of soil (clay) were removed from under the house

  • Ground plan and wall sections are shown below

 

Ground Plans

Permanent link to this article: https://www.preitenbahn.com/excavation-plans/