What remains to be done ?

The Work goes ON….

On the Whole Installation

  • Addition of Station and  Platform buildings for Preiten Hbf.

  • Complete the CATENARY system. The main reason for the holdup was to find a way to reach the back of the layout  with the Catenary in place. This is now solved with the purchase of a “Topside Creeper”.

  • Complete “Ballasting” after the Catenary system is installed.

  • Install curtains below the fascia – curtain tracks have been installed.

Engines and Rolling Stock

  • Build up a number of kit sets

  • Re-Motor some old engines (Rivarossi, Lima)

Keep the software (TrainController) up-to-date and discover New Features

  • Make Turntable Operation automatic

  • ???

Permanent link to this article: http://www.preitenbahn.com/remains-done/